This book presents a first attempt to systematically collect, classify and solve various continuous-time scheduling problems. The classes of problems distinguish scheduling by the number of machines and products, production constraints and performance measures. Although such classes are usually considered to be a prerogative of only combinatorial scheduling literature, the scheduling methodology suggested in this book is based on two mathematical...