A survey of the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives - important in practice - are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective...